The sidewalk shed is down, revealing the glass storefront. The pillars on the corner of the property will be finished soon.
The storefront has been revealed on the Worth Street facade as well.
The pilasters will be clad with their finish material shortly, then the sidewalk work will begin, creating a smooth transition into the retail space.
The elevator installation is complete! The final task was to get the light fixtures installed within the elevator cab.
The metal and glass stair railing is being installed (the steps have been built for some time).
Living room of the 2nd/3rd floor apartment with windows looking to the south (financial district).
The kitchens are just waiting for the coutertops and backsplashes.
The custom wood counter (covered for protection here) is built, stone countertops to be installed shortly.
The living room on the top floor with its large custom corner window.
Planters with ivy are still to come, but the roof decking is complete with sweeping views of TriBeCa & the Freedom Tower.
Ready for a summertime evening BBQ